- Corrugated - Screw Layout
- Purlin & Girt Frame--->
Quote
& Order-------Reload
Site
-
- See Layout
for spacing of roof purlins & wall girts. Also see
Closure
Drawing.
- -
- Wall Sheets:
At top, bottom & body of wall sheets fasten to wall
girts with (1) 1" screw at every 3rd valley. At corners
(see layout at left of drawing below) place blocking between girts (so there is a framing member to
screw to) and position a 2" wood or 1-1/2" self-drill metal screw
every 12" on-center. See Layout
Close-up.
- Roof Sheets:
In body of sheet fasten to roof purlins with (1) 2"
wood or (1) 1-1/2" self-drill metal screw every 3rd corrugation
crown. At top and bottom of roof sheets place screws every
2nd corrugation crown. At corners (see layout at left of drawing below) place blocking between
purlins (so there is a framing member to screw to) and position a
2" wood or 1-1/2" self-drill metal screw every 12" on-center. See
Layout
Close-up.
- Note: On steep slopes
one may use 1" screws in the valley of sheet. Best in high wind
areas.
- Sheet Overlaps
Use a 2" wood or 1-1/2" self-drill screw at crown of sheet
overlap. To cinch sheet together between girts and purlins use
Hy-Clinch
Rivets.
- To avoid sheet
deforming fasten screws without excessive tension.

-
- Reload
Sundance Supply Site