- Metal Building Corrugated
Layout & Screw Positioning
Quote
& Order

- Above is
roof layout.
Girts on walls spaced every 4 feet. If using rafter & stud
framing blocking between rafters & studs replaces
purlins
- Layout above will
support a 25 lb. load. For 30 lb. load position purlins
every 3 ft. For 40 lb. load position purlins every 2
ft.
- Screw
Positioning & Attachment
- At Purlins, girts
or along blocking: Place one 2" wood or self-drill screw every
corrugation crown. Also place a 1" screw in the center of the flat
area between the crowns. In high wind areas also place a 1"
screw (in the flat part of the sheet) to the right and left of
each crown.
- At Sheet
overlap: Best to use Hy-Clinch
Rivet if no framing
member below.
- At Rafters: For
greatest strength place a screw every 12". On purlin framing this
would require blocking and may only be deeded in high wind
areas.
- Roof and Wall
Corners: Place screws every 12" on-center. In high wind
areas every 3-9" on-center, depending on predicted wind
speeds. The corners of a building receive the greatest wind
loads.
- Note: To avoid
sheet deforming fasten without excessive tension. Make sure to use
our Screws
with 3/4" sealing washers. This increases holding
strength.
-
- Corrugated
Quoting and Ordering
-
- Reload
Sundance Supply Site